Ensuring the tightness of Shi Ying Shuikou brick is a key link in the installation process. The following are detailed methods and suggestions based on the latest search results:

I. Use of sealing materials

Daub fireclay: coat a proper thickness of refractory mortar (such as chrome fireclay) on the designated position on the outer surface of Shi Ying Shuikou brick to ensure uniform and full daub. This kind of fireclay can maintain good sealing performance at high temperature and prevent molten steel from infiltrating into the gap between the brick body and the seat brick.

Filling tamping material: Fill tamping material around the nozzle brick, and tamp it in layers to ensure that the tamping material is closely attached to the nozzle brick. The ramming material is sintered and solidified at high temperature to form a protective film, which further enhances the sealing performance.

II. Sealing measures during installation

Installation of seat brick: set the seat brick on the nozzle brick and ensure that the nozzle brick enters the seat brick. Filling drainage sand between the seat brick and the nozzle brick, and laying heat insulation material on the drainage sand. The heat insulation material can prevent the temperature of the drainage sand from being too high, so that the drainage sand can be sintered and solidified at low temperature to form a protective film, thus sealing the gap between the nozzle brick and the seat brick.

Adjust the seal assembly: during installation, ensure the correct installation of the seal assembly (such as sealing ring, sealing washer, etc.). For example, the installation of the first seal assembly and the second seal assembly should be carried out from bottom to top to avoid the assembly difficulty caused by gravity.

III. Inspection and adjustment

Check the gap between brick joints: ensure that the gap between brick joints is not more than 2mm, the gap between rings is controlled between 1.5 and 2mm, and the longitudinal gap is 1 to 1.5~2mm. Brick joints should be straight and even to avoid wedge-shaped brick joints.

Treatment of special parts: For the welding seam or the deformed part of kiln body, use refractory mud or ceramic fiber board to make adjustment to ensure the stability and sealing of refractory bricks.

IV. Optimize installation details

Control the number of locking irons: at the lock, strictly control the number of locking irons, usually no more than 3 pieces, to avoid stress concentration caused by over-locking.

Uniform fastening: When locking the brick, ensure that the fastening degree of the inner and outer openings is consistent to prevent local wear caused by uneven fastening.

Through the above methods, the sealing performance of Shi Ying Shuikou brick during installation and use can be effectively ensured, thus prolonging its service life and improving production efficiency.



Quick Links​​​​​​​

Product Category

Contact Us
Wangcun Town,Zhoucun District,Zibo,Shandong,CHINA
WhatsApp
+86-138-6938-4309

Subscribe To Our Newsletter

Copyright © 2023 ZIBO ZHUOYUE REFRACTORY CO.,LTD. All Rights Reserved. Sitemap | Privacy Policy | Supported by leadong.com
Leave a Message
Contact Us